← All calculators

Concrete Slab & Footing

Volume, ready-mix or bags, rebar, and waste — for slabs, footings, or walls.

Inputs

Assumptions: 1 cy = 27 ft³. Bag count assumes 60 bags of 60 lb mix per cubic yard. Rebar count is a perimeter + grid estimate; adjust for hooks, laps and chairs.

Live estimate
Volume133.3 ft³ (4.94 cy)
Volume with waste5.43 cy
Ready-mix cost$978
Or 60 lb bags (DIY)326 bags
Rebar (grid)640 linear ft

Save or send this estimate

Estimates are private to your account. We never share contact info without your OK.